Dover, VT: TNC Water Supply Design

This project consisted of a Transient Non-Community (TNC) water system redesign for the Mt. Snow Academy ski school.   The owners decided to upgrade their system to eliminate the existing underground storage tanks.   Two new storage tanks were relocated to the basement, along with a cation-anion ion exchange water treatment system and a new multistage centrifugal booster pump system.

Trinity performed the Basis of Design calculations and obtained the Permit to Construct the water treatment and storage system and prepared plans for the abandonment of the existing tank.

 

 